Description
Well cared for property. Huge 80'X175' Warehouse and shop with parts sections, tool section and workshop. Loading area dock. Cement floor, office area baths. Metal building built in 1976. Newer 2016 well constructed office building 40'X60' with 10 ft ceiling and a lower level walkout. Both levels are finished off very nicely. The 25 plus acres has lots of level area with plenty of room for expansion or parking, 1155 feet of frontage along John Stark Highway. Possibilities are many, develop other portions of the property. See maps, photos, present tenant pays $8,102 per month and pays all utilities. Owner pays the real estate taxes. Cost of replacing metal building $1,300,000. Cost to build in 2016 the office was $500,000. Lot's of value here! Newer septic system in 2016 for 42 employees. Over 1500 gallon septic tank. Newer well pump.
-
0BEDS
-
25.23ACRES
-
0BATHS
-
01/2 BATHS
School Ratings & Info
Description
Well cared for property. Huge 80'X175' Warehouse and shop with parts sections, tool section and workshop. Loading area dock. Cement floor, office area baths. Metal building built in 1976. Newer 2016 well constructed office building 40'X60' with 10 ft ceiling and a lower level walkout. Both levels are finished off very nicely. The 25 plus acres has lots of level area with plenty of room for expansion or parking, 1155 feet of frontage along John Stark Highway. Possibilities are many, develop other portions of the property. See maps, photos, present tenant pays $8,102 per month and pays all utilities. Owner pays the real estate taxes. Cost of replacing metal building $1,300,000. Cost to build in 2016 the office was $500,000. Lot's of value here! Newer septic system in 2016 for 42 employees. Over 1500 gallon septic tank. Newer well pump.